Hello everyone: Has anyone tried to sit down and actually put each ship in the Z-plan into a slip of a shipyard to see if it works? I cannot find the dates of when ships were to be laid down (estimated I know) and the building capacities of each shipyard. Can anyone help me with this? I don't think the numbers add up. Al
I have heard that some of the latter BB designs would require a significant amount of dredging to even get in and out of German harbors. I suspect to get a good answer will depend on the time frame of the plan? IE my impression is that the Z-plan was modified as time went on I could be wrong in this but I'm sure someone will correct me if I am.
Lee
Lee
For the larger proposed designs, new and larger graving docks were to be built.
This thread and the links within may offer you some help
http://forum.axishistory.com/viewtopic.php?p=92458080
Regards
Andy H
This thread and the links within may offer you some help
http://forum.axishistory.com/viewtopic.php?p=92458080
Regards
Andy H
- himmelhund
- Member
- Posts: 124
- Joined: 31 Oct 2005, 14:39
- Location: Mol Vlaanderen
Hi John,
Battleship 'H' should have been build at Blohm & Voss Hbg Build Nr 525. Order was given on 14/4/39 Kiel was laid on 15/7/39 building was halted on 30/9/39 .About 800 t of material was used another 3500 t was in production for use , 5800 t of material was delivered about 19.000 t was ordered. The ship was broken up on 25/11/41 . It should have taken 4,5 to 5 years to build ship 'H'. Building price 240.500 Reichs Mark
Battleship 'J' should have been build at Deschimag Bremen Build Nr 981. Order was given on 14/4/39 , Kiel was laid on 1/9/39 building was halted 30/9/39. About 3500 t was in production for use , 6500 t was delivered , 25.800 t of material was ordered. The hull was broken up on 25/11/41 Building price 237.000 Reichs Mark
Battleship 'K' should have been build at Deutsche Werke Kiel Build Nr 264. Order was given 25/5/39 In sumer of 1939 the build was cancelled
Battleship 'L' should have been build at Wilhelmshaven Build Nr 130 No further data
Battleship 'M' should have been build at Blohm & Voss Hbg Build Nr 526 . Order was given 7/39 , cancelled on 10/10/39
Battleship 'N' should have been build at Deschimeg Bremen , Build Nr 982 .Order was given in Summer 1939 , cancelled 10/10/39
All these ship were 277,8 m long 37 m wide , draught 11,2 m
Names : Battleship 'H' Friedrich der Grosse , Battleship 'J' Grossdeutschland
This is all I could find ( from Die deutschen Kriegsschiffe 1815-1945 by Erich Gröner)
regards ,
Himmelhund
Battleship 'H' should have been build at Blohm & Voss Hbg Build Nr 525. Order was given on 14/4/39 Kiel was laid on 15/7/39 building was halted on 30/9/39 .About 800 t of material was used another 3500 t was in production for use , 5800 t of material was delivered about 19.000 t was ordered. The ship was broken up on 25/11/41 . It should have taken 4,5 to 5 years to build ship 'H'. Building price 240.500 Reichs Mark
Battleship 'J' should have been build at Deschimag Bremen Build Nr 981. Order was given on 14/4/39 , Kiel was laid on 1/9/39 building was halted 30/9/39. About 3500 t was in production for use , 6500 t was delivered , 25.800 t of material was ordered. The hull was broken up on 25/11/41 Building price 237.000 Reichs Mark
Battleship 'K' should have been build at Deutsche Werke Kiel Build Nr 264. Order was given 25/5/39 In sumer of 1939 the build was cancelled
Battleship 'L' should have been build at Wilhelmshaven Build Nr 130 No further data
Battleship 'M' should have been build at Blohm & Voss Hbg Build Nr 526 . Order was given 7/39 , cancelled on 10/10/39
Battleship 'N' should have been build at Deschimeg Bremen , Build Nr 982 .Order was given in Summer 1939 , cancelled 10/10/39
All these ship were 277,8 m long 37 m wide , draught 11,2 m
Names : Battleship 'H' Friedrich der Grosse , Battleship 'J' Grossdeutschland
This is all I could find ( from Die deutschen Kriegsschiffe 1815-1945 by Erich Gröner)
regards ,
Himmelhund
- Panzer_Lehr
- Member
- Posts: 40
- Joined: 01 Oct 2007, 11:44
- Location: Kent, UK
-
- Member
- Posts: 1256
- Joined: 31 Jul 2010, 07:39
- Location: Philippines
Re: Z-Plan details
'Z-plan' battleship yards:
1) Wilhelmshaven Build Nr 130
2) Deutsche Werke Kiel Build Nr 264
3) Blohm and Voss Hbg Build Nr 525
4) Blohm and Voss Hbg Build Nr 526
5) Deschimag Bremen Build Nr 981
6) Deschimag Bremen Build Nr 982
The above was the summary from himmelhund post: Thanks!
1) Wilhelmshaven Build Nr 130
2) Deutsche Werke Kiel Build Nr 264
3) Blohm and Voss Hbg Build Nr 525
4) Blohm and Voss Hbg Build Nr 526
5) Deschimag Bremen Build Nr 981
6) Deschimag Bremen Build Nr 982
The above was the summary from himmelhund post: Thanks!
Last edited by nebelwerferXXX on 27 Oct 2010, 00:07, edited 1 time in total.
Re: Z-Plan details
Why do you bump a 3 years old thread just to copy info in the post by himmelhund above ??
(and without quoting him - or your source if it's not his post)
A question I have about those slips earmarked for those BBs is : were they existing by 1939 or should they have been built before the ships were laid down ? (well, for battleships from K onwards, as H&J were actually laid down)
(and without quoting him - or your source if it's not his post)
A question I have about those slips earmarked for those BBs is : were they existing by 1939 or should they have been built before the ships were laid down ? (well, for battleships from K onwards, as H&J were actually laid down)
Olivier
-
- Member
- Posts: 1256
- Joined: 31 Jul 2010, 07:39
- Location: Philippines
Re: German Target Plan?
You mean? It was only a Paper Study?73north wrote:The Z was for Ziel ( Target ) Plan
Re: Z-Plan details
Mescal,
Battleship K had a couple thousand tons, IIRC 2,980 tons, of material delivered to the shipyard prior to her expected keel laying. So, I think we can consider that one a "go".
Battleship K had a couple thousand tons, IIRC 2,980 tons, of material delivered to the shipyard prior to her expected keel laying. So, I think we can consider that one a "go".
-
- Member
- Posts: 1256
- Joined: 31 Jul 2010, 07:39
- Location: Philippines
518,000 tons
If completed, the KM should construct a 'Taranto-type' and 'Pearl Harbor-type' naval bases for this Z-plan ships. Hitler can still manage this shipbuilding program thru massive Nazi propaganda by 1947, that the war can still be won by 1945.
The 1941 Program:
---2 x 23,000-ton aircraft carriers...46,000 tons
The 1943 Program:
---4 x 10,000-ton heavy cruisers...40,000 tons
---128 x 750-ton submarines...96,000 tons
The 1944 Program:
---6 x 56,000-ton battleships...336,000 tons
The 1941 Program:
---2 x 23,000-ton aircraft carriers...46,000 tons
The 1943 Program:
---4 x 10,000-ton heavy cruisers...40,000 tons
---128 x 750-ton submarines...96,000 tons
The 1944 Program:
---6 x 56,000-ton battleships...336,000 tons