g_steer1 wrote:We are expecting the worst in terms of the structural damage caused by the removal of the cupola, it's quite evident from the car park that there is a lot of damage. But I'm sure we will overcome this with a bit of thought and hard work.
Hi Grant,
Anythings possible

, the same went for when the 634 was excavated at Stp. Corbiere. The photo shows the turret room and where you see the 2 bolts in the wall at the back there should be 2 metres of reinforced concrete but there was only a foot thick ring left with the bolts in

. The digger went down about 4 metres and no trace of the concrete wall that should have been there

. Still get problems with water getting in through the fractures resulting from the removal of the turret and also from the joints that were disturbed between the various concrete pourings from when the bunker was constructed
Give me a shout when you come over and I will open up the M19 for you if you wish
Regards,
Malcolm
PS. Are you guys planning to go the full hog and make an M19 mortar???